Concrete driveways
Old driveway broken out, 8 inches of compacted base, rebar, and a broom or smooth finish with saw-cut control joints.
Concrete driveways, exposed aggregate, stamped concrete and interlocking pavers, built on a dug-out and compacted base.
Sample image
Sample image
Sample imageConcrete driveways, exposed aggregate, stamped concrete and interlocking pavers, built on a dug-out and compacted base.
Old driveway broken out, 8 inches of compacted base, rebar, and a broom or smooth finish with saw-cut control joints.
Concrete with the stone washed to the surface for grip and a textured look that hides tire marks.
Patterns like ashlar slate and cobblestone, coloured and sealed, for patios and pool decks.
Pavers laid on compacted gravel with edge restraint and polymeric sand, easy to repair one piece at a time.
Front walks, side paths and poured or block steps, with a slight slope so water drains away from the house.
Sunken pavers re-levelled, cracked sections cut out and replaced, and broken steps rebuilt.
Starting prices for a standard residential job. Every job is measured and quoted on site, in writing. Removal of the old surface is included.
We measure, check drainage and slope, and email a written, itemized estimate within 3 days.
Choose broom, exposed aggregate, stamped or pavers. We bring samples and help with colour.
We remove the old surface, dig to depth and compact the gravel base in layers.
Concrete is poured, finished and saw-cut. Walk on it in 1 day, drive on it in 7.
Sample imageStoneroot has poured and laid driveways around Your City for 16 years. Most driveways crack or sink because of what's underneath, so we dig out, lay and compact the gravel base in layers, and grade it to drain before we pour or lay a single paver. The owner measures every job himself and stays on site the day we pour.
Serving your city and the towns nearby.
They dug out far deeper than the last company did. Three winters on and the exposed aggregate hasn't cracked.
The stamped slate patio looks like real stone, and the slope sends water away from the house now.
Our front walk had sunk and was a tripping hazard. Now it's flat and the edges are clean.
Walk on it after 24 hours and drive on it after 7 days. Keep heavy trucks off for 28 days. We'll give you the exact dates for your pour.
Concrete costs less up front and is lower maintenance. Pavers cost more but don't crack across the whole surface, and a sunken section can be lifted and re-laid.
All concrete shrinks as it cures. Saw-cut control joints tell it where to crack, so the lines stay neat and out of sight. A proper base and rebar keep the slabs from shifting.
Yes. Breaking out and hauling away the old asphalt or concrete is included in the estimate.
We recommend sealing exposed aggregate and stamped concrete every 2 to 3 years. It protects the colour and helps against salt in winter.
April to October, when overnight temperatures stay above freezing. We book the pour date around the forecast.
| Mon–Fri | 7:00am–5:00pm |
| Sat | Estimates by appointment |
| Sun | Closed |
| Season | April to November |
Call, email or send the form and we'll get back to you, usually within one business day.
This is a sample website for a fictional business. The phone number, email and address are not real, and the photos are stock images.